CASE STUDIES

At Derek Lane we have a wide range of customers and support many industries including:

No matter what the application or who the customer is, we always look to add value to their operation through our extensive knowledge of fluid power. 

From sourcing of fluid power components and product repairs, to consultation on energy savings and preventative maintenance programs, our team is here to add value to our customers across all areas of fluid power. 

Our recent hydraulic case studies below highlight some of the projects that our team have been part of.

RECENT PROJECTS

Installing three 160kW hydraulic power units for the largest stone crusher in the UK.

Measuring how to increase the efficiency of a compressed air system for a large jet turbine manufacturer.

Designing & manufacturing a range of portable flushing rigs to be used in Naval Warship applications.

Ongoing work with Babcock Marine to ensure stringent marine hydraulics maintenance is achieved.

Inspection and overhaul of Hydraulic Ice Breaker Cylinders in Landing Crafts.

Supplying a Hydraulic Power Unit and cooler & chiller units for the flushing rigs used on the S80 submarine projects.

Work with us

Contact Derek Lane & Co

Whether you work in the marine, defence, aerospace or any other industrial sector, let Derek Lane & Co be your trusted hydraulic partner.

We have the capabilities to work across a range of industries and facilitate your unique hydraulic engineering requirements. 

Get in touch with us via the contact form or call us on 01626 831400 or email [email protected]